This page will help keep the public up-to-date on the progress of the construction on the town's Water Pollution Control Facility.

For larger images, click on the photos.

6242009_24113_0.png
tpupgrade21.jpg




Treatment Plant Upgrade: Archived Updates

Updated on 7-7-2010:

Administration Bld. Boiler Room 5-21-10.jpg
Administration Building Boiler Room

Administration Bld. Roofing 5-5-10.jpg
Administration Building Roofing

Administration Bld. Work Shop Area 5-5-10.jpg
Administration Building Work Shop

Aeration Tank Concrete Stair 5-28-10.jpg
Aeration Tank Concrete Stair

Asbestos Abatement @ Incinerator 5-5-10.jpg
Asbestos Abatement at Incinerator

Blower Bld. Blower Room 5-21-10.jpg
Blower Building Blower Room

CL&P Installs new Pole 5-11-10.jpg
CL&P Installs New Pole

Electric Wireway @ Secondary Clarifier Pump Station 5-11-10.jpg
Electric Wireway at Secondary Clarifier Pump Station

Electrical Conduit Installation @ MCC 9&10 Pad 5-28-10.jpg
Electrical Conduit Installation at MCC 9&10 Pad

Electrical Manhole #44 5-11-10.jpg
Electrical Manhole #44

Entry Canopy @ Admin. Bld. 5-11-10.jpg
Entry Canopy at Administration Building

Exhaust Fans @ Admin. Bld. Roof 5-5-10.jpg
Exhaust Fans on Administration Building Roof

Folding Partition Track & Motor 5-5-10.jpg
Folding Partition Track & Motor

Hatch @ Secondary Clarifier Pump Station 5-28-10.jpg
Hatch at Secondary Clarifier Pump Station

Incinerator Demolition 5-28-10.jpg
Incinerator Demolition

Installing Wood Blocking @ Blower Bld. Roof 5-11-10.jpg
Installing Wood Blocking on Blower Building Roof

Masonry IN-fill @ Admin. Bld. Doorway D-06 5-11-10.jpg
Masonry IN-fill in Administration Building Doorway D-06

Painting @ Admin. Bld. Boiler Room 5-28-10.jpg
Painting Administration Building Boiler Room

Process Pipe @ Secondary Clarifier Pump Station 5-28-10.jpg
Process Pipe in Secondary Clarifier Pump

Roofing Work @ Blower Bld. 5-11-10.jpg
Roofing Work on Blower Building

Secondary Clarifier 3 & 4 Pump Station 5-28-10.jpg
Secondary Clarifier 3 & 4 Pump Station

Secondary Clarifier Pump Station 5-11-10.jpg
Secondary Clarifier Pump Station

Stormwater Outfall Header & Rip Rap 5-11-10.jpg
Stormwater Outfall Header & Rip Rap

Transformers Delivered @ Blower Bld. 5-21-10.jpg
Transformers Delivered at Blower Building