Skip Navigation
This table is used for column layout.
South Windsor Town Seal
Welcome to South Windsor, CT
Bottom of Town Seal

Search Our Site
 
992009_25116_0.png

DEMING STREET WIDENING


Project Description

Deming Street east of Buckland Road is narrow and has a steep hill with poor sight lines.  This is a safety concern as motorists can not see on-coming traffic well in advance and do not have a lot of road width to use to avoid a collision.  There is also a lack of adequate storm drainage that results in road flooding and icing.

Project Status

Deming Street was reconstructed from Buckland Road to just east of Grandview Terrace in 2009.  The road was widened to 26 feet in this area and the slope of the steep hill was reduced and the low area eliminated between Grandview Terrace and Sele Drive to improve the sight line and overall safety in this area.  New Storm drainage structures and pipes were installed in this section to collect  stormwater and convey it to the drainage system in Buckland Road.  


  DEMING_SM1.jpg
BEFORE
 DEMING_SM1A.jpg
AFTER
__________________________________________________________________

  DEMING_SM2.jpg
BEFORE
  DEMING_SM2AA.jpg
AFTER
___________________________________________________________________

 DEMING_SM3.jpg
BEFORE
 DEMING_SM3A.jpg
AFTER



Updated June 2010

 
Return to Home Page
Spacer
Spacer
Virtual Towns & Schools Website